Strict Standards : Buildings Fail Test for S. F. Downtown Plan
- Share via
SAN FRANCISCO — This city’s skyline beauty pageant is getting ready to introduce this year’s contestants.
The San Francisco Planning Department last month took a look at four candidates vying to erect new structures under the restricted-growth Downtown Plan. And the preliminary review showed the proposed edifices had a little shaping up to do.
Although the official date for Planning Commission review and approval will be later this month, there has been on-going evaluation of the proposals under the city’s office-space limit plan. Selection rules that will determine what projects can go ahead include:
--Suitability of the site for an office building.
--Job profile of workers--what types and how many.
--Owner entity.
--Impact on the master plan.
--Quality of building design.
--Effect of added new space on economic growth and downtown services.
In last month’s 53-page check-up, the Planning Department recommended that all four proposed structures should undergo some changes:
--At 299 2nd St., the 16-story, $21-million office retail complex was found to be inconsistent with the size and purpose of the building.
--At 235 Pine St., the 25-story, $55-million office tower needs better base design.
--At 524 Howard St., the 25-story, $22.5-million office retail building suffers from odd design of its massive tower.
--At 1601 Mission St., the eight-story Van Ness Gateway Center needs to simplify its architectural style at the upper floors.
All four candidates scored well on most of the master-plan considerations, the evaluation review stated. The first of the city’s Planning Commission official review meetings is scheduled for April 17.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.