Panel Approves Re-Striping Plan
- Share via
A plan to re-stripe a span of the San Diego Freeeay that for years has frustrated thousands of rush-hour commuters has been approved by the California Transportation Commission.
The commission, which met Thursday in Sacramento, voted unanimously to allocate $10 million to re-stripe the so-called South Bay Curve, an 11-mile stretch of Interstate 405 from the Marina Freeway to Artesia Boulevard.
Work on the project, which will add another lane in each direction to the eight-lane highway by utilizing a portion of the median strip and slightly shrinking the size of existing lanes, is expected to start in 1988.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.